A fixed-fee production audit before your first deposit

The Production Audit

Know what your product actually costs, and whether your supplier is real, before you wire the deposit.

Book the audit → See the guarantee
Price
$2,500 fixed
Timeline
2 weeks
Commission taken
$0, ever
The problem

The factory quote does not show the full cost or risk.

Before you commit, the full system needs to make sense: cost, supplier, components, timing, and logistics.

True unit cost

Tooling, decoration, packaging, freight, duty, quality control, and yield may sit outside the headline quote.

Supplier risk

The company quoting you may be an intermediary, or may not be the right manufacturer for your product, volume, or quality requirements.

Component timing

Packaging and other parts have separate MOQs, lead times, and shipping routes that must line up with production.

Unclear commitments

Yield, tolerances, lead times, payment terms, and responsibilities need to be confirmed before money moves.

The audit checks the full plan before you commit the deposit.
What you get

Five deliverables, plus a checklist.

01

Landed Cost

Tooling, packaging, freight, duty, QC, and yield in one sellable-unit cost.

02

Supplier Check

Supplier identity, capabilities, volume fit, key risks, and alternatives.

03

Packaging Check

Packaging/component cost, MOQ, lead time, sourcing route, and production fit.

04

Timeline

Approvals-to-delivery schedule, dependencies, and launch-critical timing.

05

Go / No-Go Memo

Top risks, recommended fixes, and a clear proceed / change / wait decision.

+

Deposit Checklist

Terms, specs, and responsibilities to lock in before money moves.

How it works

Two weeks, start to finish.

On booking
Intake

A questionnaire covering product, target volume, pricing, suppliers, quotes, packaging, and launch timing.

Day 1
Kickoff

A 60-minute review of the plan, assumptions, open questions, and decisions that need to be made.

Days 2–7
Verification

Supplier checks and quote validation across components, packaging, tooling, freight, and duty.

Days 8–11
Analysis

The landed cost model, production timeline, key risks, and recommended actions are built.

Days 12–14
Handoff

A 60-minute walkthrough of all five deliverables, the deposit checklist, and final questions.

Fit and scope

When the audit is useful.

Good fit

  • Product ready to quote or sample
  • Suppliers or quotes already in hand
  • Deposit or PO approaching
  • You want a second check before committing

Not a fit

  • Still deciding what to make
  • Electronics
  • Production deposit already paid
  • Design, testing, regulatory, or ongoing management
Why us

Built through our own production experience.

We took a custom physical product from concept to finished inventory ourselves: sourcing components, screening suppliers, selecting a manufacturer, and coordinating cross-border logistics. We also paid for the mistakes this audit is designed to catch: changed yield, poor freight decisions, and optimistic timing.

No factory commission, markup, or referral fee.

Read the full story →

Where this experience came from, what went wrong along the way, and where the honest limits of this advice are.

The numbers

What it could cost not to check.

Illustrative example only: 5,000 units quoted at $6.00 each — a $30,000 first order.

What was missed or misunderstoodPotential added cost
$15,000 tooling charge spread over 5,000 units instead of the assumed 30,000+$12,500
5–25% intermediary markup embedded in supplier pricing+$1,500–7,500
Decoration omitted from quote at $0.60/unit+$3,000
Air freight required to protect launch timing at $1.50/unit+$7,500
Sellable yield 10% below estimate: 4,500 good units instead of 5,000~+$3,000
Illustrative exposure if all five occur~$30,500
The Production Audit$2,500 once

The guarantee

If the audit does not identify at least $2,500 in unbudgeted cost, mispriced risk, or a material supplier issue, you do not pay.

Ready for a second opinion?

Send a note with your product, target volume, and where you are with suppliers or quotes, and we'll confirm within a day or two whether the audit is a fit.

Email hello@theproductionaudit.com →